(30 Jun 2022, 5:16 pm)Unber43 wrote I think that was before it was called the 65 orginally, so looking at maybe 2005/6It was in 1997 (from the Bygone area):
The extension to Dryburn Hospital was cut in November 1997. Sunderland extension was cut before 2002 (which is when they started putting timetables online).