(01 Jul 2022, 2:32 pm)ifm001 wrote Probably because it is contracted by Nexus the North Shields to Jarrow section and at present is doing perfectly well with the SNE 10/11 operating the route. No need for the 9 to be even consideredTbh the 10/11 need to be replaced. I've never seen the 10/11 on time at all since it happened. Plus I feel sorry for the drivers that have to do South Shields to North Shields via every estate
RE: Go North East: Major Service Changes July 2022