(08 Jul 2022, 8:28 pm)Storx wrote Too much cost, the Nexus timetables are all automated. They've got better things to do than designing custom timetables. At least they've actually got timetables unlike the rest of the North East pretty much; now that's a real problem.I don't agree. If one of thier jobs is to promote public transport, then they could at least take time to set up the displays correctly to make it easier for potential customers to read.
Some of them are truly abysmal. For example, until the March changes, they insisted on showing the Newcastle 32/32A on FOUR separate panels in the same direction, purely because there was a different operator in the evenings and Sundays and on each route. That is just daft. Operators should really be pressurising for better roadside information in my opinion