(27 Aug 2022, 6:55 pm)L469 YVK wrote How can Percy Main remain open with only that amount of work? Surely they'd be better doing a 'deal' with Arriva who have presence around North Tyneside but will soon lack nearby facilities.
I won't go into anymore detail on this thread to 'avoid' it turning into a hard suggestion.
Aye can't disagree really. I'm sure they'll have a plan somewhere tbf.
(27 Aug 2022, 7:00 pm)cbma06 wrote Since PM duties go through the Tyne tunnel to do some Washington services on the evenings etc…, Couldn’t the 27 be transferred to PM from Riverside?, it would free up more space at riverside depot.
Sent from my iPhone using Tapatalk
Not a bad shout that tbf. Be interesting, it's the same with the 34 and CLS locals since Washington doesn't really have much more space and Consett is rumoured to be gaining the 6 aswell. I'm sure we'll find out soon though.