It’ll be interesting to see how Riverside manage the chaotic 21 and X21, particularly issues at the Southern end where a lot of the issues occur.
The A1 isn’t really a fast dead run solution these days with the roadworks (until 2024 at least)
RE: Closure of Chester-le-Street Depot
Wistfully stuck in the 90s