(07 Nov 2022, 8:02 pm)cbma06 wrote Wasn’t the Tyne dock to consett line joined the top of leamside line then became the C2C cycle route to the east to west of Washington. Can easily take out cycle route and replace it with metro lines, been done before when metro was extended to south HyltonThere is a path that runs alongside the Leamside from Seven Houses to Barmston. The C2C starts at Pattinson and uses mainly the trackbed to Consett. The metro would not impinge on the C2C route.
Sent from my iPhone using Tapatalk
RE: Tyne and Wear Metro