(15 Nov 2022, 12:48 pm)Andreos1 wrote Works on the A19 again.
Putting right the absolute cowboy job that was done when they widenened and resurfaced some of the section between Wolviston and Norton.
I think this is the 3rd time they've been back, since the initial works were finished last year.
They're doing a portion of resurfacing beyond the Wolviston on slip on the northbound section at the mo off memory. Which means diverting via Hartlepool or Sedgefield/The Trimdons.
It's nothing to do with the widening mind. It's just the last remaining part of concrete that was outside the scheme.
Not an easy thing to get arid of hence the nighttime closures for weeks in probably the worst place to have a closure on the A19 in terms of diversions.