(30 Nov 2022, 11:41 pm)Storx wrote 51, 52, 53, 54 (Interwork) - 5.3 Mile or 12 minutes including an Ashington board 0 milesBut tbf even services which have large layovers are going NIS, the 39As are constantly cancelled due to delayed operations, 21 which have 7 mins at CLS & Newcastle are going NIS.
43, 44, 45 (Interwork) - 5.3 Mile or 12 minutes including Morpeth boards where Ashington are already based
55 - Awkward One
Gateshead to Riverside is 3.3 Mile or 8 minutes and there's an awful lot more buses doing it.
It's virtually the same as most of those.
The X30/X31/X45 interworking isn't working either as the X45 is quite often late and so is a lot of other routes lately because of squeezing timetables too much. The X21 4/5 minute layover is utter farcical for the length of the route, it's no wonder it's 20+ minutes late all the time.
56's which have about 12 mins, same as the 60 are constantly late, the 56 is appalling on a night they're never on time.
Same with the 22/23 they're always late.