(01 Dec 2022, 8:45 am)Unber43 wrote But tbf even services which have large layovers are going NIS, the 39As are constantly cancelled due to delayed operations, 21 which have 7 mins at CLS & Newcastle are going NIS.
56's which have about 12 mins, same as the 60 are constantly late, the 56 is appalling on a night they're never on time.
Same with the 22/23 they're always late.
Probably tight timetables, just to put into context the 21 only has an extra 6 minutes between CLS over the X12. Either one has too much time or the other too little considering the 21 stops at every stop and the X12 runs not stop half the time.