(13 Feb 2023, 11:12 pm)Storx wrote 306 - As is
307 - 310/311 combined
308 - As is
309 - As is
310 - Withdrawn
311 - Withdrawn
Says in there, just thought you'd like to know.
For those that can't be bothered to trawl through the document, 306/307/308/309 would each run every 5 minutes (306 all journeys will run to Whitley Bay, with the terminus extended to Bournemouth Gardens where GNE's 1 currently terminates).
Proposed timetables show
306/308 interwork with a PVR of 15 (a reduction of 3)
307 and 309 standalone with PVR's of 6 and 8 respectively, 14 in total (a reduction of 2)