(02 Mar 2023, 3:32 pm)cbma06 wrote
Since the 520/521 contract is down for to be cancelled which will save 1 daytime bus for GCT, but 2 buses needed for the 71 contract, wonder if some portion of the 520/521 route could be merged into the 71.
Does anyone still knows if the allocated buses on the 20a still be doing the 65, as I last heard that DCC weren’t happy with the same bus doing the 20A doing the 65 in case of more delays on service 65, what portions of service 65 are secured?, as DCC were threatening to withdraw all secured aspects on service 65 if GNE goes ahead with there plan
Sent from my iPhone using Tapatalk
Logically, aye it could. But I don't know if DCC and Nexus could work together on that one.
The whole thing is an unadulterated shambles.