(07 Mar 2023, 6:03 pm)tynesider wrote Could the 1 extension to the MetroCentre be an indirect result of losing the 19 to Cowboy Taxis of Gateshead - erm I mean Central Taxis of Gateshead - to, at least in part, give Percy Main some lost work?It would compensate Percy Main for losing the 19 and 311, and will also take the pressure off Riverside which still struggles with cancellations at times.
That said, if the 25 and 28/29 move to Riverside, it'll be Washington that has the net reduction in work.