(04 May 2023, 2:09 pm)Unber43 wrote What was the layover time for the 35 before it last changed, as they seem to always be quite late, I remember someone mentioing it was reduced does anyone know how much.
Add PVR 1 to 35 to improve reliability, and possibly extend it to High Pittington, it would be about 7 mins each way, leaving enough layover time for 15 at Low Moorsley and 10 at Boldon.
Also a Sunderland to Follingsby link imo is needed the 35 would literally be perfect.
I remember years ago, it having 10/15mins (might have been more) at Low Moorsley and using the layover at the top of the village.