(14 Jun 2023, 4:31 pm)Adrian wrote Depending on loadings though, it can have a knock on impact.
Look at the X1 (and to some degree, 56) to Newcastle. On paper its a 12 minute frequency dropped to 15 minute, but they seem to regularly struggle to keep on time. Especially on a Saturday.
Same with the 20/60 at deptford, I mean there are 4 on last time I looked out of 6, two 20 mins late.
The 56 aswell it needs an extra PVR, on an evening and throughout the day they never leave on time from Park Lane or Newcastle, 5 mins either end isn't enough.