(25 Jul 2023, 6:36 pm)markydh wrote All the West Road services have been affected by various traffic light upgrades, sometimes in multiple locations at any one time along the entire length of the road, for months. This can sometimes double the amount of time it takes to get into and from the city centre. I’m sure there are driver-related cancellations but most of it is due to the roadworks at both ends of the route.
So surely there should be some temp timetable changes to assit with reliability, maybe an increase in PVR or two