(22 Aug 2023, 3:47 pm)gc802002 wrote Accepted Today , Both Parts
But with the start date pushed back 2 weeks to commence on the 21st September rather than the 4th.
Meaning the residents along the 12 route will have a gap of two weeks between Arriva finishing on the 12 and Stagecoach’s 6/6A starting.