(29 Aug 2023, 5:58 pm)ASX_Terranova wrote You could spilt the 2 at sunderland and give the washington part extra running time if traffic is a problem.I'd suspect the issue here is about covering as much, with as little resource as possible. Splitting the 2 in Sunderland is not only an extra bus, but it's significant waste in layover time, and it's confusing for passengers who have a through service all day.
What were the loadings when the 8 ran to sunderland in the evenings?
(29 Aug 2023, 7:55 pm)User2613 wrote Was that not wen it ran all the way through to Sunderland while they had the contract for the Sunderland end so ran it the full length until end of service? I was thinking only extend as far as galleries.Yes, I recall it (the 8) ran all the way to Sunderland, but I believe it was fully commercial.