(15 Dec 2023, 5:56 am)Unber43 wrote Just looking through FB, and the UK Railways have a tonne of problems,
TFW Overcrowding
XC not enough trains/overcrowding
EMR Norwich to Liverpool overcrowding
GC 180's reliability
Replacement for TPE Class 69
Northern's 156/153 replacements (apparently Northern want 185 for that)
Avanti as a whole
Appauling state of the Class 800 on LNER/GWR (seats, relability etc)
I think the only good train company really is East Anglia
An absolute dumpster fire
Don't forget about the wiring on the ECML.
Lost track, but I'm sure there's been 3 incidents in the last 7 days with the wiring coming down.
There's the failure of several TOC's and the voluntary (sometimes in-voluntary) handing back of the keys too.
And the creative book-keeping from Go-Ahead TOC's.