(17 Dec 2023, 9:30 am)Storx wrote The running time is shorter...?The whole reason why the loop will likely be in place (subject to consultation) is so that running times can be increased. Effectively, the time saved interworking the X21 & 35 via the loop will be re-invested elsewhere in both routes.
https://www.google.com/maps/dir/55.18566...?entry=ttu
The X21/35 are combined effectively doing that loop now. Rather that the X21 doing:
https://www.google.com/maps/dir/55.18566...?entry=ttu
RE: Arriva North East: Upcoming Service Changes