(24 Apr 2024, 9:52 pm)col87 wrote 34611 had to be withdrawn yesterday as the speedometer was broke and 34605 apparently broke down at Clavering today. The 6/7 often gets packed so yes they definitely needs to be full size buses again.Let’s hope it’s a link from the Headland to Seaton , like the old 12. That would link both areas of Hartlepool that attract visitors.
They three solutions here for Stagecoach either they improve the pits/build new ones at the existing depot, move to a new and better depot elsewhere in the town, or have Stockton be responsible for the major engineering works on them. but the current plan is Stockton’s buses will be replacing the fleet once they get the electrics so they must be something in place.
I know they are looking into the Hartlepool network as well and I believe they are looking into bringing at least one former service back on a trail basis.
RE: Stagecoach North East Latest News