(28 Apr 2024, 2:35 am)Glen1974 wrote When is stagecoach Stockton depot start to repaint E200mmc in new colours I am sorry say before.
as stated last time you asked... nothing is planned for at least 6 months, the current planning assumption is the E200s, then the remaining E400s and finally any remaining E300s are to be done first,
after those pre MMC models have been completed the next currently in line vehicles are the 16-plate E400 MMCs from slatyford and walkergate, then the 66 plate E200 MMCs from slatyford, and after those either your Stockton E200s MMCs or the remaining walkergate E400 MMCs. if there is any other news it will be posted