(16 Jun 2024, 8:31 am)busmanT wrote The 317 timetable, designed and specified by Nexus, must be one of the few in an urban area in the whole of the country that has the same running time Mon-Fri peak and interpeak, and the same layover time peak and interpeak, with no allowance for increased traffic levels at peak times.
And with minimal recovery time at Whitley Bay (which includes having to go round the block).
Did they change the timetable when GNE won the tender, seemed people were happy enough with it prioer to the change of hands?