(02 Feb 2025, 2:17 pm)Storx wrote Aye it could never be done in it's current form. Would have to have massive investment on both sides of the Tyne to remove all the traffic hot spots so it would flow well.Newcaslte should just have a massive bus station, where all services go into.
Btw the 22 (Stagecoach) is only 2 miles shorter than the 43/21 would be combined from Chester Le Street to Cramlington. There's long routes around heading East / West. The North/South transport links across Newcastle are dire though.
Then cross tyne links wouldnt be needed as there is a designated SAFE WARM TOILETED spot to wait