(09 Feb 2025, 8:41 pm)V514DFT wrote See if they interworked the X24/X24A/X34, how much would the PVR increase (if at all), normally thr X34 has a 400MMC on it
The X34 is no longer operated by Sunderland depot, it did interwork while it was from there but has been back under shields operating for about 1 year. Sunderland do run it on Sundays and interwork with X24 on a pvr of 2/3