(01 May 2025, 11:22 am)L469 YVK wrote If GNE changed the Derwentside interworking patterns meaning only a low height PVR of x4 was needed, subsequently freeing up most E400MMC for the X10 & X21, would 6356-63 & 6308-14 have issues on the X32/X45/X70/X73 even if they had some heavy TLC?
Not too sure, don't use the routtes much really. It's quite hilly over there though. They'd probably be alright though since it's not constant 60/70mph.
If, and big if, you wanted to move the E400MMC's I'd say do this:
X21 70 Plates -> Washington (50/X1)
50 16 Plates -> Riverside (51/52/93/94)
X20 B5TL -> Riverside (51/52/93/94)
62 Plate B9TL's -> Deptford (X20)
Angel Streetdeck's -> Consett
It means the two depots which are struggling right now get more newer vehicles and the really knackered vehicles are at Riverside doing easy work. It also gives Washington the ability to switch things around and a decent reserve for the X1, as the 50 isn't a badly loaded service tbh.