(10 Jun 2025, 9:11 am)ReDemPTiion wrote I’ve been told by the operations manager of Stockton (I am a driver at Slatyford) that there was some required to be done outside the depot which was out of their control. They’ve been told they can have their full roll out Monday 23rd June as long as nothing changes.
Yes the contractors employed by Stockton Council haven’t been great! Have had to replace numerous bits of cable along Portrack Lane to the sub station!
Works have now pretty much concluded and we’ve been given the same roll out date