RE: Northern (Arriva Rail North)
Is the Pelaw - Sunderland section's signalling double blocked (to minimise risk of collisions between heavy rail trains and the old Metrocar fleet)? I was thinking once the 555s are fully in service and the Metrocar fleet withdrawn they could go back to single block signalling which could improve capacity - though would that require re-signalling?