(21 Jan 2026, 1:01 pm)Andreos1 wrote Vehicles withdrawn and passengers left waiting.
https://www.bbc.co.uk/news/videos/cq84d1828zwo
Vehicles were all withdrawn in early December last year, Metrobus have sourced some 40 plus buses from other Go-Ahead Subsidies including Go-Ahead London, East Yorkshire, Brighton & Hove, Swindon Bus Company, Bluestar and Carousel along with loans from Independents such as Chaseside and Southern Transit along with a number of E200MMC's from a Rental Firm to cover while the Hydroliner Fleet is away at Wrightbus being checked over so this 90 minute wait and cancellations is probably a load of bollocks from BBC News South East.
https://bustimes.org/operators/metrobus/vehicles