(Yesterday, 11:28 am)L469 YVK wrote Take it the 35 will be running a padded timetable with a PVR of 6x?
Will these be converted to Euro 6 or be left alone just for the 35 and occasional use on the 1/2/57/57A?
Just checked and it doesn’t look like these would be charged for entering the Newcastle CAZ?