(Yesterday, 12:04 pm)OrangeArrow49 wrote So there will be seven Kites for the 2, and fourteen smaller Kites for everything other than 16, 17 and 18? 16 and 17 will have longer E200MMCs (electric?) and the 18 will have little E200MMCs as now? No Evoras for Darlington?
No - the 16 will likely be either a small E200MMC or remain worked by the Solo (3053). The 17 interworks with the 8 so will be large single deckers. Darlington are due 10 full size (11.8m) E200MMCs for an as-yet-unannounced route.