(05 Mar 2026, 8:48 pm)PH - BQA wrote Some significant cuts across the board really and, bar contract wins, no improvements to any services either as far as I can see. Evening services starting to be cut back on quite a few routes, 352 cut back to only one trip per day, and the 307/309 timetable is a shambles.
I note that, yet again, the consultation has magically made them realise some journeys do need to run. Assume, like the PM peak 352, these will be axed next time around.
Im amazed the 352 is still going. Its bested by the 37 in everyway. They will more than likely reduce it to a morning run or number it the 353A or something like that
It does make me wonder what the point in the consultation was as the changes are just the 352 & X39 evening journeys cut. Like are we at a point now where every little thing has to be consulted on. For an evening journey to be scrapped like do people really need to have a say
I like the fact they cut a lot of evening journeys or retimed them and they were never in the consultations