Roadworks on the central motorway bridge on Sandyford Rd are causing utter chaos to the 307/9/X39 and Stagecoach 1 and 22X
307/9/39 were running around 35 minutes late, same with 22X
It took 6200 an hour to get from cobalt to haymarket
Only solution would be to omit Sandyford entirely which the 22 can. This is ongoing until September so imagine something will need to be done
RE: Disruptions and driver shortages
Wistfully stuck in the 90s