(Yesterday, 1:39 pm)deanmachine wrote If only there was say a light rail system connecting Gateshead with Newcastle, that had a bunch of extra rolling stock recently introduced that could run an enhanced service through the core whilst this was happening.
Easier said than done. Are you pulling the extra drivers out of thin air?