(02 Jul 2026, 2:12 pm)Storx wrote 350 and W2.
Two completely pointless services imo.
Just merge the 350/351/W2 into one route running every 30 minutes doing the 351 route extended to Whitley Metro (the busiest one out the 3 whenever I see it at the Whitley side).
i'm about to get on the 350 right now and trust me its a lot better than the 351 and it also exists so that the 350/351 can run on their own as previously the 351, 359 and 335 were all connected. as it stands im pretty sure it'd be impossible to make the 351 every 30 mins even if it didn't additionally serve the W2 route, and the lower journey times on 350 are much needed. its actually faster than the 309 to Whitley bay.