(25 Apr 2014, 7:22 pm)mb134 wrote Could they allocate them so that every other working is a coach? Therefore everyone can still use the service as the other workings will be low floor, obviously if Arriva put this information on the timetable
On the X93? No, besides some loadings last summer were said to even exceed the capacity of one of the E400s requiring a second to work a duplicate.