(27 May 2014, 4:03 pm)Michael wrote Who was it before on here asking when changes to the 40/41/80 will happen?
PB0003954/357 - GO NORTH EAST LIMITED, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Variation Accepted by SN: Operating between Wallsend, Metro and Wallsend, Metro given service number 40/41 effective from 16-Jun-2014. To amend Route and Timetable.
PB0003954/472 - GO NORTH EAST LIMITED, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Variation Accepted by SN: Operating between North Shields, Bedford Street and Wallsend METRO given service number 80 effective from 16-Jun-2014. To amend Route and Timetable.
PB0003954/580 - GO NORTH EAST LIMITED, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Variation Accepted by SN: Operating between WHITLEY BAY THE LINKS and WREKENTON HIGH STREET/KIBBLESWORTH SQUARE given service number 1/1A effective from 16-Jun-2014. To amend Route and Timetable.
Wonder what the 1/1A changes are...
Waterworks by Northumbrian Water in Howdon are the cause for the change