Just a thought
X9 - Newcastle – Gateshead – Heworth – Peterlee – Billingham – Stockton Middlesbrough - Every 30 Minutes using B9TL's Operated by Go North East
X10/X93 - Newcastle - Gateshead - Heworth - Middlesbrough - Whitby - Robin Hoods Bay - Scarborough - Every 1 Hour/Every 2 Hours per Operator using Coaches (Limited Stopping Service, Jointly Operated with Arriva) - 10 Minutes Layover in Middlesbrough before changing into X10/X93 - 5 Minutes Layover at Each End of the Route using 2 Drivers, 1 Each Way to meet European Driving Requirments.
X92 - Middlesbrough - Whitby - Every 30 Minutes using B7TL's Operated by Arriva
The Cost of the Coaches would be evenly split between both Operators, and would be Operated in same way as National Express/Stagecoach Megabus Services.
RE: 2014 GNE Bus Order Predictions