(04 Aug 2014, 8:44 am)Tom wrote Was thinking, the X25 could be extended to Durham once a hour, along the 13 route to replace it. As passenger numbers on the 13 and X25 are crap, could the whole route be reduced to hourly?
Wrong thread!!
Skip to main content