(04 Aug 2014, 7:45 pm)Michael wrote I forgot about the 307 changing. GNE havent got the timetable up yet.
The 28/28A is also changing from the 31st and still no timetable.
New 28/28A timetable from Durham pindar site.
http://durham.pindarcreative.co.uk/tt2/28_28A.pdf