(31 Aug 2014, 7:45 pm)Andreos Constantopolous wrote Why can't Durham run it by themselves? Or am I missing something obvious?
If it is down to the timetable, surely something can be done.
I often see the 8.10 arrival into Durham and it is generally full in term times.
Noticed a difference once the holidays kicked in.
Without adding to the running cost - no. At least 2 of the Stockton workings start and finish down in the Teesside area. Then there's the cost of re-working the Sunday journeys which are geared to operation out of Stockton (and interwork with all of Stockton's Middlesbrough Sunday runs apart from the 5s of course).