Anyone remember my Q3 Idea from a while back, well I have came with what I think is a better Idea
Q1 - MetroCentre Circular - Riverside Depot - Centrelink - Quayside - Newcastle City Centre Loop (Q2 Route) - Quayside - St Peters Basin - Quayside - Baltic - Gateshead College - The Sage - Gateshead Interchange
Q2 - MetroCentre Circular - Riverside Depot - Centrelink - Quayside - Baltic - Gateshead College - The Sage - Gateshead Interchange - The Sage - Gateshead College - Baltic - Quayside - St Peters Basin - Quayisde - Newcastle City Centre Loop (Q2 Route)
Merger of the Q1/ Current Q2 and S1 resulting in the Current Q2/S1 Being Withdrawn - Operating Every 15 Minutes Combined, Not sure on PVR but I think 8 Vehicles, 4 for each Service would Suffice, Leaving 2 Vehicles spare.
RE: Go North East Service Suggestions