(01 Oct 2014, 6:52 pm)aureolin wrote Something I've never thought about before, but certainly related. If say Operator A ran a contract for Nexus with a PVR of 4. If Operator B then won that work from Nexus, would TUPE apply for the 4 staff required to drive that contract?
When GNE won the Quaylink contract, the Stagecoach staff were Tupe'd across.