(02 Oct 2014, 1:20 pm)Michael wrote Would seem better, no one ever uses it
The Q1 currently takes 18 minutes from Gateshead Interchange to Central Station and 16 minutes going the other way. I think adding at least 3 minutes could stop running in twos, but could also reduce the PVR from 4 to 3.
A round trip on the Q2 takes 37 minutes, although I think that a few minutes could also be added. On a 15 minute frequency, rather than 10, the PVR could be reduced from 4 to 3.
Not sure where two Versas could go? Possibly a spare for 'The Orbit' and 'South Tyne'?