(14 Nov 2014, 6:35 pm)aureolin wrote But in entering a tender, an operator should ensure that it has sufficient resources, to meet the requirements of a contract.
They have 3 buses for the cathedral bus. 2 solos plus the E200. One of the 3 is for the mealbreaks. Its not going to be very often that 2 buses are VOR. I must admit the depot isnt that big. I do advise them to extend it or move somewhere else.
That being said, if they didnt have the correct resources, would theyhave gained the contract in the first place?