RE: Arriva North East - Latest
After reading the comments about the problems with the doors and alternator brackets on the Streetlites I hope that Arriva senior management get this addressed before 1590 t0 1594 enter service on the Darlington X1 as this is a very demanding route with tight timings.It also operates from an outstation where a door problem could be an issue. It would be a shame for a route that has been built up to be held back by the current Pulsars being replaced by a bus not entirely suitable