(23 Dec 2014, 8:13 pm)mrnut85 wrote We run 1/2 instead of 3/4/7/8 and economic services start later
Since the changes at the end of November, Saturdays on Teesside see a reduced service level with reduced frequencies until mid/late morning (36/37/38 don't reach the 7 1/2 minutes normal until 11am). Anyone working along Portrack Lane living in Stockton have a nice 1hr 45 minutes gap between the last short 13 (the old 39s) and the first full trip.