(28 Dec 2014, 5:36 pm)cbma06 wrote From 25th January the times of most buses on Go North East route 17, between Cramlington and Wallsend, are changed by a few minutes.
http://www.northumberland.gov.uk/default.aspx?page=3972
I overheard two gentlemen in Wallsend discussing changes to service 17, and one claimed that he had been 'reliably informed' that service 17 was to decrease to a 30-minute frequency from its current 20-minute frequency, so as to allow the PVR to decrease by one vehicle which will in turn assist with the withdrawal of another Volvo B10BLE from the fleet. Perhaps the timings have had to be altered accordingly for the Cramlington 'extension' of the route?