(26 Jun 2013, 7:37 pm)nk55 wrote Re waggonway, I dont think the scanias would be painted up and then left on current route for 2 months, its more likely they'd go over sooner & speaking to cls supervisor it was anticipated vehicle moves were expected within 3 weeks. Take the highway scanias, they were painted up and operated from deptford for a few weeks before moving to gereshead, surely gne wont want to confuse Metrolink passengers by repainting the current fleet and then reintroduce tge metrolink branding on the citaros in 2 months time.
They did the same with Diamond Citaros also, I think they were a bit longer than 3 weeks though before they were branded and trasferred.