(24 Feb 2015, 9:07 pm)Dan wrote The issue is that, on Monday - Friday and Sunday daytimes, a PVR upgrade wouldn't be necessary. I'm inclined to suggest that something needs to be done about peak times, as I've seen standees from the front of a single deck to the back. Saturday daytimes seem to cope fine at the moment with single deckers, but every seat always seems to be occupied. Peak times, same story.
Wonder if it would be possible to retain the current PVR but drop red buses onto the X66 at peak times to keep things moving?
I think it's potentially more complex than most other routes. I agree with your point about Saturday daytimes, but I think you've still got a constant flow, which is more than a standard rigid bus can cope with, Monday-Friday daytime. The complexity comes from the morning demand solely being A to B, but the afternoon/early evening demand solely being B to A?