(23 Mar 2024, 1:18 pm)mb134 wrote As a few examples, none of the following flows are covered by the 1/2/57/57A:
- Newcastle to Cramlington Industrial Estate
- Newcastle to Guide Post/Bedlington
- Regent Centre to Cramlington Industrial Estate
- Regent Centre to Bedlington/Bedlington Station/Ashington/Guide Post/Stakeford/Newbiggin
- Cramlington Industrial Estate to Bedlington Station/Stakeford/Nedderton/Bedlington (west end/towards Rothesay Terrace)/Newbiggin/Ashington (bar the town centre)
Regent Centre to anywhere on the Northumberland Line would require either 2 changes (at South Gosforth and Northumberland Park) or a trip into town first to change at Central. If you've got a direct bus who is going to do that given it'll take longer?
I think there'll be an impact on the bus in some areas, particularly because of the recent impacts of driver shortages and cancelled trips, but as someone who has had a lot of exposure to these services there are a large amount of passengers who won't be able to complete their trips on the Northumberland Line.
Aye of course, I don't expect the buses to be cancelled all together of course.
I don't want to go down the suggestions but I wouldn't be surprised to see the X22 go via Cramlington to stock up the X10/X11 personally.
Drop the X10/X11 down to 3 BPH and then have the X22 running with them so it's 6 BPH to Cramlington. It could easily run the current route to Brockwell then just rejoin the current route by the A192.
Cramlington isn't going nowhere. Personally I'd love to see the X9 upped to 3 BPH aswell and try and grow it on the massive new housing estates being built at the West side of the town tbh.